homeWelcome, sign in or click here to subscribe.login
     


 

 

Architecture & Engineering


Design
Perspectives

By Clair Enlow

Subscriber content preview

January 30, 2019

Design Perspectives: Elegant solution? Selig offers $10M to help fund bridge in exchange for taller waterfront building

By CLAIR ENLOW
Special to the Journal

The 75 Marion project is out of the box. It will replace a piece of the solid old industrial brick waterfront with a new glassy tower — a retail-office complex, topped with housing — and it clearly will command enviable views and get attention.

It's no surprise that the future of the block between Alaskan Way and Western Avenue — right across from the Colman Dock ferry terminal — will be very different. Beginning this year, it'll be freed up on three sides: first by the viaduct demolition (including the Columbia Street on-ramp) and later when the Marion Street Bridge comes down on the north side.


 
. . .


To read this story in full login or purchase a subscription.



Previous columns:



Email or user name:
Password:
 
Forgot password? Click here.